CRTSⅡ Bi-block Ballastless Track Sleeper Prefabrication and Laying Technology
LiChangning DaiYu GaoGuang更新时间:2020-06-29 11:38:44
最新章节:References封面
版权信息
Brief Introduction of the Book
Preface
Foreword
1 Overview for CRTSⅡBi-blockBallastless Track Structure
1.1 Structure of CRTSⅡBi-block Ballastless Track on Subgrade
1.2 Structure of CRTSⅡBi-blockBallastless Track on Bridge
1.3 Structure of CRTSⅡBi-blockBallastless Track in Tunnel
2 Prefabrication and Production ofCRTSⅡBi-block Sleeper
2.1 Basic Structural Requirement for Sleeper Yard
2.2 Tooling Equipment Configuration
2.3 Organization Management of Sleeper Yard
2.4 Material Management for Sleeper Yard
2.5 Technical Process Flow for Sleeper Production
2.6 Operation Key Points forCritical Working Procedure
2.7 Sleeper Construction
2.8 Quality Control
3 Overall ConstructionTechnical Flow Process
3.1 Overall Construction Program
3.2 Overall Construction Technical Flow Process
4 Construction Preparation
4.1 Construction Measurement
4.2 Personnel Training
4.3 Construction Technology Preparation
4.4 Inspection and Assessment forBallastless Track Laying Condition
4.5 Equipment Entering Site and Acceptance
4.6 Construction Drill Organization
4.7 Setting-out and Construction ControlMeasurement for CPⅢTrack Control Network
5 Logistics Organization Planning
5.1 Sleeper Transportation and Storage
5.2 Rebar Transportation and Storage
5.3 Concrete Supply
6 Assembly and Site Transition forMechanical Construction Equipment
6.1 Equipment Transportation
6.2 Equipment Assembly
6.3 Equipment Transferring between Lines
6.4 Equipment Transition between Sites
7 Construction Measurement
7.1 Overall Scheme for Measurement
7.2 Plane Control Measurement
7.3 Height Control Measurement
7.4 Track Installation Measurement
8 Concrete Supporting LayerConstruction on Subgrade
8.1 Structure Overview
8.2 Construction Technological Process
8.3 Construction Technical Requirements
8.4 Site Operation Organization
8.5 Main Machine and Equipment Configuration
8.6 Quality Inspection and Acceptance
8.7 Quality Control
9 Concrete Base Construction on Bridge
9.1 Structure Overview
9.2 Construction Technological Process
9.3 Construction Technical Requirement
9.4 Site Operation Organization
9.5 Main Machine and Equipment Configuration
9.6 Quality Inspection and Acceptance
9.7 Quality Control
10 Concrete Track Bed Slab Construction
10.1 Structure Overview
10.2 Construction Technological Process Flow for the Mechanical Vibration and Embedded Method
10.3 Key Point of Construction Technique forMechanical Vibration and Embedment Method
10.4 Site Operation Organization
10.5 Main Machine and Equipment Configuration
10.6 Quality Inspection and Acceptance
10.7 Quality Control
References
更新时间:2020-06-29 11:38:44